[
https://issues.apache.org/jira/browse/YARN-2145?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14027813#comment-14027813
]
Wei Yan commented on YARN-2145:
-------------------------------
duplicate with YARN-2083?
> FairScheduler can assign more resources to queue with MaxShare set.
> -------------------------------------------------------------------
>
> Key: YARN-2145
> URL: https://issues.apache.org/jira/browse/YARN-2145
> Project: Hadoop YARN
> Issue Type: Bug
> Components: fairscheduler
> Affects Versions: 2.5.0
> Reporter: Andrey Stepachev
> Attachments: YARN-2145.diff
>
>
> method fair.FSQueue#assignContainerPreCheck() uses Resources.fitsIn
> incorrectly, because if queue is at its maximum capacity method returns true
> and container can be assigned to queue with maximum resources already
> consumed.
> That is because fitsIn code do '<=' comparison and if allocated resources ==
> max resources fitsIn still returns true, and consequently pre check successes
> {code}
> public static boolean fitsIn(Resource smaller, Resource bigger) {
> return smaller.getMemory() <= bigger.getMemory() &&
> smaller.getVirtualCores() <= bigger.getVirtualCores();
> }
> {code}
> Provided patch introduced Resources.less method, it more lightweight then
> lessThan.
--
This message was sent by Atlassian JIRA
(v6.2#6252)