[ https://issues.apache.org/jira/browse/YARN-2534?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14129611#comment-14129611 ]
Hadoop QA commented on YARN-2534: --------------------------------- {color:green}+1 overall{color}. Here are the results of testing the latest attachment http://issues.apache.org/jira/secure/attachment/12667934/YARN-2534.000.patch against trunk revision 4be9517. {color:green}+1 @author{color}. The patch does not contain any @author tags. {color:green}+1 tests included{color}. The patch appears to include 1 new or modified test files. {color:green}+1 javac{color}. The applied patch does not increase the total number of javac compiler warnings. {color:green}+1 javadoc{color}. There were no new javadoc warning messages. {color:green}+1 eclipse:eclipse{color}. The patch built with eclipse:eclipse. {color:green}+1 findbugs{color}. The patch does not introduce any new Findbugs (version 2.0.3) warnings. {color:green}+1 release audit{color}. The applied patch does not increase the total number of release audit warnings. {color:green}+1 core tests{color}. The patch passed unit tests in hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager. {color:green}+1 contrib tests{color}. The patch passed contrib unit tests. Test results: https://builds.apache.org/job/PreCommit-YARN-Build/4882//testReport/ Console output: https://builds.apache.org/job/PreCommit-YARN-Build/4882//console This message is automatically generated. > FairScheduler: totalMaxShare is not calculated correctly in > computeSharesInternal > --------------------------------------------------------------------------------- > > Key: YARN-2534 > URL: https://issues.apache.org/jira/browse/YARN-2534 > Project: Hadoop YARN > Issue Type: Bug > Components: scheduler > Affects Versions: 2.5.0 > Reporter: zhihai xu > Assignee: zhihai xu > Attachments: YARN-2534.000.patch > > > FairScheduler: totalMaxShare is not calculated correctly in > computeSharesInternal for some cases. > If the sum of MAX share of all Schedulables is more than Integer.MAX_VALUE > ,but each individual MAX share is not equal to Integer.MAX_VALUE. then > totalMaxShare will be a negative value, which will cause all fairShare are > wrongly calculated. -- This message was sent by Atlassian JIRA (v6.3.4#6332)