[
https://issues.apache.org/jira/browse/YARN-3286?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14390553#comment-14390553
]
Hadoop QA commented on YARN-3286:
---------------------------------
{color:green}+1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12708671/0001-YARN-3286.patch
against trunk revision 2e79f1c.
{color:green}+1 @author{color}. The patch does not contain any @author
tags.
{color:green}+1 tests included{color}. The patch appears to include 1 new
or modified test files.
{color:green}+1 javac{color}. The applied patch does not increase the
total number of javac compiler warnings.
{color:green}+1 javadoc{color}. There were no new javadoc warning messages.
{color:green}+1 eclipse:eclipse{color}. The patch built with
eclipse:eclipse.
{color:green}+1 findbugs{color}. The patch does not introduce any new
Findbugs (version 2.0.3) warnings.
{color:green}+1 release audit{color}. The applied patch does not increase
the total number of release audit warnings.
{color:green}+1 core tests{color}. The patch passed unit tests in
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager.
Test results:
https://builds.apache.org/job/PreCommit-YARN-Build/7189//testReport/
Console output: https://builds.apache.org/job/PreCommit-YARN-Build/7189//console
This message is automatically generated.
> Cleanup RMNode#ReconnectNodeTransition
> --------------------------------------
>
> Key: YARN-3286
> URL: https://issues.apache.org/jira/browse/YARN-3286
> Project: Hadoop YARN
> Issue Type: Improvement
> Components: resourcemanager
> Affects Versions: 2.6.0, 2.7.0
> Reporter: Rohith
> Assignee: Rohith
> Attachments: 0001-YARN-3286.patch, YARN-3286-test-only.patch
>
>
> RMNode#ReconnectNodeTransition has messed up for every ReconnectedEvent. This
> part of the code can be clean up where we do not require to remove node and
> add new node every time.
> Supporting to above point, in the issue discussion YARN-3222 mentioned in the
> comment
> [link1|https://issues.apache.org/jira/browse/YARN-3222?focusedCommentId=14339799&page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel#comment-14339799]
> and
> [link2|https://issues.apache.org/jira/browse/YARN-3222?focusedCommentId=14344739&page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel#comment-14344739]
> Clean up can do the following things
> # It always remove an old node and add a new node. This is not really
> required, instead old node can be updated with new values.
> # RMNode#totalCapability has stale capability after NM is reconnected.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)