[
https://issues.apache.org/jira/browse/YARN-3439?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14393410#comment-14393410
]
Hadoop QA commented on YARN-3439:
---------------------------------
{color:red}-1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12709044/YARN-3439.001.patch
against trunk revision eccb7d4.
{color:green}+1 @author{color}. The patch does not contain any @author
tags.
{color:green}+1 tests included{color}. The patch appears to include 1 new
or modified test files.
{color:green}+1 javac{color}. The applied patch does not increase the
total number of javac compiler warnings.
{color:green}+1 javadoc{color}. There were no new javadoc warning messages.
{color:green}+1 eclipse:eclipse{color}. The patch built with
eclipse:eclipse.
{color:red}-1 findbugs{color}. The patch appears to introduce 2 new
Findbugs (version 2.0.3) warnings.
{color:green}+1 release audit{color}. The applied patch does not increase
the total number of release audit warnings.
{color:green}+1 core tests{color}. The patch passed unit tests in
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager.
Test results:
https://builds.apache.org/job/PreCommit-YARN-Build/7200//testReport/
Findbugs warnings:
https://builds.apache.org/job/PreCommit-YARN-Build/7200//artifact/patchprocess/newPatchFindbugsWarningshadoop-yarn-server-resourcemanager.html
Console output: https://builds.apache.org/job/PreCommit-YARN-Build/7200//console
This message is automatically generated.
> RM fails to renew token when Oozie launcher leaves before sub-job finishes
> --------------------------------------------------------------------------
>
> Key: YARN-3439
> URL: https://issues.apache.org/jira/browse/YARN-3439
> Project: Hadoop YARN
> Issue Type: Bug
> Components: resourcemanager
> Affects Versions: 2.7.0
> Reporter: Jason Lowe
> Assignee: Daryn Sharp
> Priority: Blocker
> Attachments: YARN-3439.001.patch
>
>
> When the Oozie launcher runs a standard MapReduce job (not Pig) it doesn't
> linger waiting for the sub-job to finish. At that point the RM stops
> renewing delegation tokens for the launcher job which wreaks havoc on the
> sub-job if the sub-job runs long enough for the tokens to expire.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)