[ 
https://issues.apache.org/jira/browse/YARN-3639?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Xianyin Xin updated YARN-3639:
------------------------------
    Summary: It takes too long time for RM to recover all apps if the original 
active RM and NN go down at the same time.  (was: It takes too long time for RM 
to recover all apps if the original active RM and namenode is deployed on the 
same node.)

> It takes too long time for RM to recover all apps if the original active RM 
> and NN go down at the same time.
> ------------------------------------------------------------------------------------------------------------
>
>                 Key: YARN-3639
>                 URL: https://issues.apache.org/jira/browse/YARN-3639
>             Project: Hadoop YARN
>          Issue Type: Bug
>          Components: resourcemanager
>            Reporter: Xianyin Xin
>         Attachments: YARN-3639-recovery_log_1_app.txt
>
>
> If the node on which the active RM runs dies and if the active namenode is 
> running on the same node, the new RM will take long time to recover all apps. 
> After analysis, we found the root cause is renewing HDFS tokens in the 
> recovering process. The HDFS client created by the renewer would firstly try 
> to connect to the original namenode, the result of which is time-out after 
> 10~20s, and then the client tries to connect to the new namenode. The entire 
> recovery cost 15*#apps seconds according our test.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to