[
https://issues.apache.org/jira/browse/YARN-4699?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Sunil G updated YARN-4699:
--------------------------
Attachment: 0001-YARN-4699.patch
As I see it, if we can update usedCapacity of the label while changing label on
a node, this issue can be fixed. Tested various cases mentioned in the patch,
and with this fix, it comes up correctly.
Attaching this patch for an initial review. [~leftnoteasy] thoughts?
> Scheduler UI and REST o/p is not in sync when -replaceLabelsOnNode is used to
> change label of a node
> ----------------------------------------------------------------------------------------------------
>
> Key: YARN-4699
> URL: https://issues.apache.org/jira/browse/YARN-4699
> Project: Hadoop YARN
> Issue Type: Bug
> Components: capacity scheduler
> Affects Versions: 2.7.2
> Reporter: Sunil G
> Assignee: Sunil G
> Priority: Critical
> Attachments: 0001-YARN-4699.patch, AfterAppFInish-LabelY-Metrics.png,
> ForLabelX-AfterSwitch.png, ForLabelY-AfterSwitch.png
>
>
> Scenario is as follows:
> a. 2 nodes are available in the cluster (node1 with label "x", node2 with
> label "y")
> b. Submit an application to node1 for label "x".
> c. Change node1 label to "y" by using *replaceLabelsOnNode* command.
> d. Verify Scheduler UI for metrics such as "Used Capacity", "Absolute
> Capacity" etc. "x" still shows some capacity.
> e. Change node1 label back to "x" and verify UI and REST o/p
> Output:
> 1. "Used Capacity", "Absolute Capacity" etc are not decremented once labels
> is changed for a node.
> 2. UI tab for respective label shows wrong GREEN color in these cases.
> 3. REST o/p is wrong for each label after executing above scenario.
> Attaching screen shots also. This ticket will try to cover UI and REST o/p
> fix when label is changed runtime.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)