[
https://issues.apache.org/jira/browse/YARN-4761?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Sangjin Lee updated YARN-4761:
------------------------------
Attachment: YARN-4761.01.patch
Posted patch v.1.
Applied the same fix to the fair scheduler.
> NMs reconnecting with changed capabilities can lead to wrong cluster resource
> calculations on fair scheduler
> ------------------------------------------------------------------------------------------------------------
>
> Key: YARN-4761
> URL: https://issues.apache.org/jira/browse/YARN-4761
> Project: Hadoop YARN
> Issue Type: Bug
> Components: fairscheduler
> Affects Versions: 2.6.4
> Reporter: Sangjin Lee
> Assignee: Sangjin Lee
> Attachments: YARN-4761.01.patch
>
>
> YARN-3802 uncovered an issue with the scheduler where the resource
> calculation can be incorrect due to async event handling. It was subsequently
> fixed by YARN-4344, but it was never fixed for the fair scheduler.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)