[ 
https://issues.apache.org/jira/browse/YARN-4819?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15194891#comment-15194891
 ] 

Rohith Sharma K S commented on YARN-4819:
-----------------------------------------

In the method {{SLSUtils#getRackHostName}}, rack names are returned without 
slash. But this causes ResourceRequest for resources rack has sent without 
slash.
{code}
@Private
@Unstable
public class SLSUtils {

  // hostname includes the network path and the host name. for example
  // "/default-rack/hostFoo" or "/coreSwitchA/TORSwitchB/hostBar".
  // the function returns two Strings, the first element is the network
  // location without "/", the second element is the host name. for example,
  // {"default-rack", "hostFoo"} or "coreSwitchA/TORSwitchB", "hostBar"
  public static String[] getRackHostName(String hostname) {
    NodeBase node = new NodeBase(hostname);
    return new String[] {node.getNetworkLocation().substring(1),
        node.getName()};
  }
{code}

> SLS requested containers are never allocated for NODE_LOCAL and RACK_LOCAL 
> type
> -------------------------------------------------------------------------------
>
>                 Key: YARN-4819
>                 URL: https://issues.apache.org/jira/browse/YARN-4819
>             Project: Hadoop YARN
>          Issue Type: Bug
>          Components: scheduler-load-simulator
>            Reporter: Rohith Sharma K S
>
> SLS requested containers are always assigned in off-switch mode. And 
> scheduler will never allocate any containers for Node-Local and Rack-local 
> mode. 
> The reason for the above behavior is parsing of jobinput file for container 
> host and rack. The input given in job file for rack and node is like below.
> {code}"container.host" : "/default-rack/node1",{code}. But after parsing , 
> the resource request sent for rack is "default-rack" which misses slash('/'). 
> While container allocation during node heartbeat , node rack  name is 
> resolved for rack which is */default-rack* with which look up for resource 
> request for this rack returns null. So, All the requests are assigned to 
> off-switch.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to