[
https://issues.apache.org/jira/browse/YARN-5164?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15309069#comment-15309069
]
Hadoop QA commented on YARN-5164:
---------------------------------
| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:blue}0{color} | {color:blue} reexec {color} | {color:blue} 0m 0s
{color} | {color:blue} Docker mode activated. {color} |
| {color:red}-1{color} | {color:red} patch {color} | {color:red} 0m 4s {color}
| {color:red} YARN-5164 does not apply to trunk. Rebase required? Wrong Branch?
See https://wiki.apache.org/hadoop/HowToContribute for help. {color} |
\\
\\
|| Subsystem || Report/Notes ||
| JIRA Patch URL |
https://issues.apache.org/jira/secure/attachment/12807303/YARN-5164-inclusive.4.patch
|
| JIRA Issue | YARN-5164 |
| Console output |
https://builds.apache.org/job/PreCommit-YARN-Build/11780/console |
| Powered by | Apache Yetus 0.3.0 http://yetus.apache.org |
This message was automatically generated.
> CapacityOvertimePolicy does not take advantaged of plan RLE
> -----------------------------------------------------------
>
> Key: YARN-5164
> URL: https://issues.apache.org/jira/browse/YARN-5164
> Project: Hadoop YARN
> Issue Type: Sub-task
> Components: capacityscheduler, fairscheduler, resourcemanager
> Reporter: Carlo Curino
> Assignee: Carlo Curino
> Attachments: YARN-5164-example.pdf, YARN-5164-inclusive.4.patch,
> YARN-5164.1.patch, YARN-5164.2.patch
>
>
> As a consequence small time granularities (e.g., 1 sec) and long time horizon
> for a reservation (e.g., months) run rather slow (10 sec).
> Proposed resolution is to switch to interval math in checking, similar to how
> YARN-4359 does for agents.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]