[
https://issues.apache.org/jira/browse/YARN-5069?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Eric Payne updated YARN-5069:
-----------------------------
Fix Version/s: (was: 2.7.4)
2.7.3
Changing Fix Version to 2.7.3 since branch 2.7.3 has not yet been created.
> TestFifoScheduler.testResourceOverCommit race condition
> -------------------------------------------------------
>
> Key: YARN-5069
> URL: https://issues.apache.org/jira/browse/YARN-5069
> Project: Hadoop YARN
> Issue Type: Test
> Reporter: Eric Badger
> Assignee: Eric Badger
> Fix For: 2.7.3
>
> Attachments: YARN-5069-b2.7.001.patch, YARN-5069.001.patch
>
>
> There is a race condition between updating the node resources and the node
> report becoming available. If the update takes too long, the report will be
> set to null and we will get an NPE when checking the report's available
> resources.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]