[ 
https://issues.apache.org/jira/browse/YARN-4069?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Joep Rottinghuis updated YARN-4069:
-----------------------------------
    Labels: YARN-5355  (was: )

> For long running apps (> 2 days), populate flow activity table
> --------------------------------------------------------------
>
>                 Key: YARN-4069
>                 URL: https://issues.apache.org/jira/browse/YARN-4069
>             Project: Hadoop YARN
>          Issue Type: Sub-task
>          Components: timelineserver
>            Reporter: Vrushali C
>            Assignee: Varun Saxena
>              Labels: YARN-5355
>
> YARN-4063 / YARN-3901 contain the work being done to populate the flow 
> activity and flow run tables.
> The flow activity table is updated each time a yarn application is created 
> and finishes. So if an application runs for more than 3 days, day1 has an 
> entry for the flow for start time, day3 has an entry for the flow for end 
> time but day2 has no entry for that flow. 
> Filing the jira to ensure that for long running apps, the flow activity table 
> does get a snapshot time entered for each day that an application is running 
> in that flow.
> It may be the case that for ALL apps (long running or not) the same update 
> may be done in the flow activity table.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to