[
https://issues.apache.org/jira/browse/YARN-5774?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Yufei Gu updated YARN-5774:
---------------------------
Summary: MR Job stuck in ACCEPTED status without any progress in Fair
Scheduler (was: A wrong parameter is passed when normalizing resource requests)
> MR Job stuck in ACCEPTED status without any progress in Fair Scheduler
> ----------------------------------------------------------------------
>
> Key: YARN-5774
> URL: https://issues.apache.org/jira/browse/YARN-5774
> Project: Hadoop YARN
> Issue Type: Bug
> Components: resourcemanager
> Affects Versions: 3.0.0-alpha1
> Reporter: Yufei Gu
> Assignee: Yufei Gu
>
> MR Job stuck in ACCEPTED status without any progress in Fair Scheduler
> because there is no resource request for the AM.
> The problem is in the code used by both Capacity Scheduler and Fair
> Scheduler. scheduler.increment-allocation-mb is a concept in FS, but not CS.
> So the common code in class RMAppManager passes the
> yarn.scheduler.minimum-allocation-mb as incremental one because there is no
> incremental one for CS when it tried to normalize the resource requests.
> {code}
> SchedulerUtils.normalizeRequest(amReq, scheduler.getResourceCalculator(),
> scheduler.getClusterResource(),
> scheduler.getMinimumResourceCapability(),
> scheduler.getMaximumResourceCapability(),
> scheduler.getMinimumResourceCapability()); --> incrementResource
> should be passed here.
> {code}
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]