This email is automatic generated from yast CI node. It lists of pull requests
that have no activity more then three working days. If your module is listed,
please check all pull request, why they are not merged yet.
Pending requests in repository yast-installation:
- Master base product logging (9 days)
https://github.com/yast/yast-installation/pull/907
- Replace old splash commands with plymouth ones (33 days)
https://github.com/yast/yast-installation/pull/904
Pending requests in repository yast-instserver:
- Adapt Rakefile and Dockerfile for SLE-15-SP2 (100 days)
https://github.com/yast/yast-instserver/pull/50
Pending requests in repository yast-metapackage-handler:
- Add unit tests for methods of OneClickInstallWorkerFunctions class (20 days)
https://github.com/yast/yast-metapackage-handler/pull/25
- Extend unit test for existing functions (41 days)
https://github.com/yast/yast-metapackage-handler/pull/23
Pending requests in repository yast-network:
- wpa_supplicant proposal switched to network-ng (13 days)
https://github.com/yast/yast-network/pull/1154
- WIP: Fixed AY's interfaces reader (10 days)
https://github.com/yast/yast-network/pull/1144
Pending requests in repository yast-online-update:
- Added recommends to yast2-online-update-frontend (bsc#1177997) (109 days)
https://github.com/yast/yast-online-update/pull/33
Pending requests in repository yast-packager:
- Adding NFS repository: Checking user input e.g. white spaces in serve… (74
days)
https://github.com/yast/yast-packager/pull/543
- Include some hints in the "Priority" label (bsc#1154693) (142 days)
https://github.com/yast/yast-packager/pull/482
Pending requests in repository yast-registration:
- Master base product logging (9 days)
https://github.com/yast/yast-registration/pull/529
Pending requests in repository yast-yast2:
- Logging all available products information into directory /var/log/Y… (9
days)
https://github.com/yast/yast-yast2/pull/1135
Pending requests in repository yast-ycp-ui-bindings:
- Failing autowrap (75 days)
https://github.com/yast/yast-ycp-ui-bindings/pull/64
- New UI Example for ComboBox (90 days)
https://github.com/yast/yast-ycp-ui-bindings/pull/62
Pending requests in repository yast-ruby-bindings:
- Logging all available products information into directory /var/log/Ya… (9
days)
https://github.com/yast/yast-ruby-bindings/pull/267
Pending requests in repository skelcd-control-openSUSE:
- Ntp servers (41 days)
https://github.com/yast/skelcd-control-openSUSE/pull/223
Pending requests in repository yast-auth-client:
- Bsc1172340 (87 days)
https://github.com/yast/yast-auth-client/pull/94
Pending requests in repository yast-auth-server:
- Bsc1172340 (87 days)
https://github.com/yast/yast-auth-server/pull/66
- Fix an issue where pkg dependencies were not install (149 days)
https://github.com/yast/yast-auth-server/pull/63
- Fixes to make the YaST modules work (606 days)
https://github.com/yast/yast-auth-server/pull/48
Pending requests in repository yast-journal:
- Use Yast::Builtins.strftime in 'Change Filter' dialog (139 days)
https://github.com/yast/yast-journal/pull/45
Pending requests in repository yast-storage-ng:
- Alternative implementation of: use the driver to decide whether _netdev is
needed (33 days)
https://github.com/yast/yast-storage-ng/pull/1199
- Use the driver to decide whether _netdev is needed (31 days)
https://github.com/yast/yast-storage-ng/pull/1198
- Partial fix for bug#176140 (96 days)
https://github.com/yast/yast-storage-ng/pull/1166
- Display pathnames correctly in a Right-to-Left context (bsc#1128091) (90
days)
https://github.com/yast/yast-storage-ng/pull/873
Pending requests in repository docker-yast-ruby:
- drop travis (27 days)
https://github.com/yast/docker-yast-ruby/pull/37
Pending requests in repository docker-yast-cpp:
- drop travis (27 days)
https://github.com/yast/docker-yast-cpp/pull/26
Pending requests in repository skelcd-control-leanos:
- Default ntp servers (41 days)
https://github.com/yast/skelcd-control-leanos/pull/72
Pending requests in repository yast-rmt:
- Add metadata into packages (140 days)
https://github.com/yast/yast-rmt/pull/51
- use docker image from OBS (159 days)
https://github.com/yast/yast-rmt/pull/50
- Enforce full coverage (159 days)
https://github.com/yast/yast-rmt/pull/40
Pending requests in repository skelcd-control-MicroOS:
- sync with SLE (81 days)
https://github.com/yast/skelcd-control-MicroOS/pull/27
- unify proposed partition sizes with openSUSE MicroOS (82 days)
https://github.com/yast/skelcd-control-MicroOS/pull/26
Pending requests in repository skelcd-control-SMO:
- install the microos-selinux pattern by default (13 days)
https://github.com/yast/skelcd-control-SMO/pull/6