Hi all.  

Tuesday, I will be out very soon after the morning meeting for a few hours.  
Yay, flex time.

Here's a quick state of the kanban cards for you all, both so that people who 
start earlier than I have an idea what's going on in their morning, and so that 
the morning meeting maybe can be shorter.

= Feature Work 1 =

Status: 674422 (allowing edit of structural subscriptions per bugtarget) is 
waiting on Danilo to finish allowing adds, and on me and Graham to land our 
work on muting team subscriptions.  We're almost done with it.  (Graham, my 
branch is all done with JS and server tests, but I need to wait until one of 
two branches lands in order to get a sane diff in an MP.)

Actions to be done:

- 728370 (bug subscription page shows direct subscriptions) is now a high 
priority because it is blocking the rest of us contributing much to unsubscribe 
in anger.  Danilo and I have an idea as to what the task is, so one of us will 
work on that setup tomorrow to unblock everyone else's participation.  The two 
blocked cards in "FW 1: Tasks" are blocked because of this.  (Danilo, as we 
discussed, a high priority is to set this up in such a way that we can all 
collaborate; if you get to this task before I, please consider it in your 
design.)

- "bug includes link to subscription page" can be done by someone.  This simply 
means that, when you look at a bug, there is a link to bug/+subscriptions (e.g. 
https://bugs.launchpad.net/lazr.restful/+bug/691841/+subscriptions).  This 
needs to be feature-flagged with whatever we are using for the other ~yellow 
stuff.  AFAIK it is a super small task that at least benji and bac know how to 
do at this point, and can teach the rest of us.

= Other stuff =

I'd like everyone to be available with two hours warning to get back on 
"unsubscribe in anger".  If you can do a "design/tweak improvement" in the 
backlog "subdivide 1" lane in that amount of time, go for it.  If you can do a 
"Quick Job" task in that amount of time, go for it.  If you can't do any of 
those in the time allotted, figure out something else good to do with slack 
time, and let us all know about it the next day in the "miscellaneous" gray 
lane.  And look at all those peer reviews and expenses to be done!

OK, tell me, did you really read this? :-)

Thanks

Gary
-- 