Status Summary:
- Thanks to the team for sending in status via email, now we have up to date
status on the wiki before this meeting.
- 72 M2 features, 16 Done, 17 Patch Review, 34 Dev/Accept (10 in A/B/C), 1
on-going, 3 Design, 1 Design Review.
- Half still in development but close to be done. Needs attention to catch up.
Issues
1. Layer tooling design review: this is done (Richard)
2. Build Yocto behind firewall - complete, patch review (Joshua/Darren):
There will be some improvement in for this in M2, we need additional follow-on
item for this one in M3
3. Item not on schedule: "Time limited kernel' (Bruce) : this is bug 1007,
design is done, working on development, making this in M2 is still a bubble.
4. Liping:
Image Creator: HOB performance enhancement
Blocked,Liping's code need to wait for Joshua's code to merge first. Risk
to slip
5. running post installs at rootfs gen time, Sprint D: Dexuan has a design
but the PRC team has no time for this one: Drop this from the 1.1 schedule but
keep it on feature list for post 1.1 action.
6. Beth: need to discuss a 1.0 release of yocto-autobuilder: No need for this
now
Build status: A build out yesterday and there is a QA report this morning. Team
will look at the QA report and address bugs uncovered.
Bug Status:
1. 7 M2 new bugs: Richard (2), Saul (2), Nitin (3)
2. 3 M2 high bugs:
* 1134: Saul will give more info to Ke to recreate this.
* 1099: Song will send Dexuan email on the status of this one
* 1007: Bruce started development on this one.
Documentation: there is a draft of the Yocto development guide being reviewed.
So this is done.
Sprint D (current week) items:
1. BSP config cleanup : need a follow on item for this in M3
2. Kernel Tools : move to M3
3. kernel bloat - development: move to M3
4. BBMX: done, Darren will open a new bug to track a related issue.
5. 3G - complete: working on some revision and fixes, needs attention, risk
to slip
6. Enhance the deploy part in remote debug: developer assigned to something
else, move to M3
Action Item:
1. Song: update Google calendar with the new bridge info
2. Darren: open a new bug to track a BBXM related issue
3. Bruce: Split bug 414 into multiple ones to work and track separately
4. Song: send Dexuan note about bug 1099.
No meeting next week due to US holiday on Tuesday