Current Dev Position: YP 2.2 M1

Next Deadline: YP 2.2 cut off: June 13, 2016


SWAT team rotation: Anibal -> Tracy

https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


Key Status/Updates:

*        Python3 testing is showing much higher success. There remain some 
small issues in eSDK, automated testing and toaster but the core now builds 
reliably and successfully. The code is being cleaned up for submission next 
week.

*        The week was challenging due to the volume of patches combined with 
the python3 work, glibc changes breaking pseudo which made it into fedora and a 
uninative upgrade we were testing, the glibc upgrade accidentally losing a key 
code change, an autobuilder not having python3 present and various other misc 
failures which took time to disentangle.

*        buildtools-tarball now contains python3 in preparation for the upgrade 
to python 3 in bitbake.

*        The minimum version requirement for python3 is looking to be python 
3.4 at this point.

*        WDD rose slightly

*        YP 1.8.2 is nearing QA completion, there were some issues which are 
still being investigated but are unlikely to block release

*        YP 2.0.2 is nearly ready to be built, just finalizing the patchset

*        meta-intel 5.0 released


Key YP 2.2 Dates:

*        YP 2.2 M1 cut off would be: 6/13/16

*        YP 2.2 M1 release would be: 6/24/16

*        YP 2.2 M2 cut off would be: 7/18/16

*        YP 2.2 M2 release would be: 7/29/16

*        YP 2.2 M3 cut off would be: 8/29/16

*        YP 2.2 M3 release would be: 9/9/16

*        YP 2.2 M4 cut off would be: 10/3/16

*        YP 2.2 M4 release would be: 10/28/16


Tracking Metrics:

            WDD 2626 (last week 2618)

(https://wiki.yoctoproject.org/charts/combo.html)


Key Status Links for YP:

https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.2_Status

https://wiki.yoctoproject.org/wiki/Yocto_2.2_Schedule

https://wiki.yoctoproject.org/wiki/Yocto_2.2_Features

[If anyone has suggestions for other information you'd like to see on this 
weekly status update, let us know!]

Thanks,

Stephen K. Jolley
Yocto Project Program Manager
INTEL, MS JF1-255, 2111 N.E. 25th Avenue, Hillsboro, OR 97124
*   Work Telephone:        (503) 712-0534
*    Cell:               (208) 244-4460
* Email:                            [email protected]
-- 
_______________________________________________
yocto mailing list
[email protected]
https://lists.yoctoproject.org/listinfo/yocto

Reply via email to