I just moved to 1.0.3 and I've done several test builds.  In one of the 
builds, I removed a project directory from the working directory to test 
out the Changes section in the build log.  When I ran the build again, 
Continuum checked out the missing directory just fine.  After the build, 
in the e-mail and on the web interface, the Changes section shows 3 blank 
columns and then the files that have changed in the 4th column.

I think it may be broken again.


_Mang

Reply via email to