Hi,

> the project is marked in error when the project state can't be 
> saved. In next version, I think we'll remove this project 
> state and use only the latest build result instead.
Hm, that's strange cause for the the first time I load the  Project Group 
Summary it shows the buildstate correct. And the second time it looses the 
state and shows the "build in Error"



-----Ursprüngliche Nachricht-----
Von: Emmanuel Venisse [mailto:[EMAIL PROTECTED] 
Gesendet: Freitag, 30. November 2007 16:07
An: continuum-users@maven.apache.org
Betreff: Re: Wrong build status in Project Group Summary



[EMAIL PROTECTED] a écrit :
> Hi,
> currently I have a strange error with the displaying of the build status in 
> the continuum web interface.
> 
> I uploaded some screenshots to my old opera profile, which I never used but 
> this was the shortest way to get them up somewhere. The mail was too large 
> for the mailinglist.
> http://my.opera.com/pfuschi/albums/
> 
> Just take a look at the screenshots. 
> 
> In continuum-1.jpg you learn that 3+1 = 5 ;-)

Yes, and it is "normal" ;)
you must read it like that:
3 projects in success + 1 project in failure + 1 project not built yet (isn't 
in success/failure/error) = 5

> 
> in continuum-2.jpg it is a total mess. The 4 success and 1 failed build, 
> which you can see at the top of the screenshot, would be the right set of 
> states...

File an issue and we'll look at it.

> 
> continuum-3.jpg is the real build result of the first project that is 
> in "Error" state (see in continuum-2.jpg) continuum-4.jpg is the real 
> build result of the second project that is in "Error" state (see in 
> continuum-2.jpg)

the project is marked in error when the project state can't be saved. In next 
version, I think we'll remove this project state and use only the latest build 
result instead.

Emmanuel

> 
> I'm using continuum 1.1 final.
> 
> Greetz
> 
> Manuel
> --
> T-Systems Business Services GmbH
> Application Service Center ISW Auto + MI 1 Fasanenweg 5, 70771 
> Leinfelden-Echterdingen
> +49 711 972-44092 (Tel.)
> E-Mail: [EMAIL PROTECTED] <mailto:[EMAIL PROTECTED]>
> Internet: http://www.t-systems.de <http://www.t-systems.de/>
> 
> T-Systems Business Services GmbH
> Aufsichtsrat: RenéObermann (Vorsitzender) Executive Committee: Helmut 
> Binder*, Albert Henn*, Olaf Heyden, Katrin Horstmann, Ulrich Kemp*, 
> Wilfried Peters*, Dr. Herbert Schaaff, Zvezdana Seeger
> Handelsregister: Amtsgericht Bonn HRB 6787Sitz der Gesellschaft: Bonn 
> WEEE-Reg.-Nr. DE50335567* Geschäftsführer gem. §35 GmbHG
> 
> Notice: This transmittal and/or attachments may be privileged orconfidential. 
> If you are not the intended recipient, you are hereby notified that you have 
> received this transmittal in error; any review, dissemination, or copying is 
> strictly prohibited. If you received this transmittal in error, please notify 
> us immediately by reply and immediately delete this message and all its 
> attachments. Thank you.
> 
> T-Systems -Business flexibility
> 
> 

Reply via email to