Why? I don't see why we would want to make a branch just for 2.0-m1.
SVN is not the best tool for working with many branches, so I would
recommend keeping the active branches to an absolute minimum.
What happened to stabilizing 1.2 and getting that out?
I think that if you want to make 2.0-m1, then just pick a time on
trunk when it looks good, then make the release and move on to the
next milestone. IMO adding more branches here will just complicate
the matter way more than it needs to be for a pre-alpha release.
--jason
On Dec 11, 2006, at 1:05 PM, Matt Hogstrom wrote:
All,
Being the overly optimistic one that I am I'd like to branch trunk
tomorrow in the afternoon. The goal of the branch is to stabilize
a milestone release with the content previously discussed.
So far it looks like we have:
JSF,
Java Mail
Tomcat 6
Jetty 6
JSTL
Java 1.5 ready
and JPA
I think Kevan is working on the specs which need to be completed
for Geronimo 2.0 as well as 1.2. OpenEJB will need to release as
well so I'm hoping to have an answer on the DayTrader issues
tonight or tomorrow.
I'm currently working through some issues with DayTrader on 1.2
which also apply to Geronimo 2.0. My thiking is that people will
continue to work on trunk (2.0) while the M1 release is cleaned and
made ready. I'll do the packaging and people can happily continue
to hack away at trunk.
Any major items missing?
Matt Hogstrom
[EMAIL PROTECTED]