Hi, I plan to do a release of the Sling Post Servlet, and I see 2 open issues [1] scheduled for this release 2.4.4
* https://issues.apache.org/jira/browse/SLING-8974 (unassigned) * https://issues.apache.org/jira/browse/SLING-9531 (assigned to Konrad) Should I wait for some more days with the release so they can get included? Or is it ok to move these 2 to the next release? [1] https://issues.apache.org/jira/projects/SLING/versions/12349585 Jörg -- Cheers, Jörg Hoh, https://cqdump.joerghoh.de Twitter: @joerghoh