Pierre,
As long as the site listing is current you can go ahead and do the testing there. Since the intentional radiator requirements in your band are radiated QP or average E field limits the site needs to be listed to show acceptable radiated site attenuation. The test procedures described in the lab's test report will be reviewed to determine whether the lab made the intentional radiator measurements correctly. Best regards Tom Cokenias Consultant, EMC and Radio Approvals P.O. Box 1086 El Granada, CA 94018 tel 650 726 1263 fax 650 726 1252 or 413 332 6528 At 3:17 AM -0400 7/8/99, SMEE Actions Mesures wrote: >I need to perform measurements on a low-power, non licensed transmitters >acoording to FCC part 15, subpart C. >The fundamental frequency is below 500 Mhz (higher frequency to measure is >< 2Ghz). > >I usually use a test facility located in France to perform test according >to subpart B. This test facility is listed to FCC and on the letter from >FCC, only the subpart B is mentionned. > >Does anyone know if I can use this test facility to perform test against >Subpart C ? --------- This message is coming from the emc-pstc discussion list. To cancel your subscription, send mail to majord...@ieee.org with the single line: "unsubscribe emc-pstc" (without the quotes). For help, send mail to ed.pr...@cubic.com, jim_bac...@monarch.com, ri...@sdd.hp.com, or roger.volgst...@compaq.com (the list administrators).