May i try another coding ?

While testing<>end
call (nobeer)
call collegues(headache&sweat&cursing)
call nopromotion(this year)
end while
If testresult= pass then 
call pub(beer)
else
fired(now)
end if


Regards,

Ing. Gert Gremmen
Approvals manager
------------------------------------------------------------------------------------


+ ce marking of electrical/electronic equipment
+ Independent Consultancy Services
+ Compliance Testing and Design for CE marking
     according to EC-directives:
        - Electro Magnetic Compatibility 2004/108/EC
        - Electrical Safety 2006/95/EC
        - Medical Devices 93/42/EC
        - Radio & Telecommunication Terminal Equipment 99/5/EC
+ Improvement of Product Quality and Reliability testing
+ Education

Web:    www.cetest.nl (English) 
Phone :  +31 10 415 24 26
-------------------------------------------------------------------
This e-mail and any attachments thereto may contain information 
that is confidential and/or protected by intellectual property rights 
and are intended for the sole use of the recipient(s) named above. 
Any use of the information contained herein (including, but not 
limited to, total or partial reproduction, communication or 
distribution in any form) by persons other than the designated 
recipient(s) is prohibited. If you have received this e-mail in error, 
please notify the sender either by telephone or by e-mail and 
delete the material from any computer. 
Thank you for your co-operation.


-----Original Message-----
From: John Woodgate [mailto:jmw1...@btinternet.com] 
Sent: Wednesday 5 October 2016 15:05
To: ce-test, qualified testing bv - Gert Gremmen; EMC-PSTC@LISTSERV.IEEE.ORG
Subject: RE: [PSES] When is EMI testing performed?

I'd like to write this using the puzzling math symbols 'inverted A' and 
'reversed E', but it's too much of a hassle, so you have to imagine them:

For all [EMC/EMP tests], there exists [ending]. There exists [ending] = 
[happy]. IFFI [ending] = [happy], then there exists [beer]. 

With best wishes DESIGN IT IN! OOO – Own Opinions Only www.jmwa.demon.co.uk J M 
Woodgate and Associates Rayleigh England

Sylvae in aeternum manent.


-----Original Message-----
From: ce-test, qualified testing bv - Gert Gremmen [mailto:g.grem...@cetest.nl]
Sent: Wednesday, October 5, 2016 1:41 PM
To: EMC-PSTC@LISTSERV.IEEE.ORG
Subject: Re: [PSES] When is EMI testing performed?

Thanks Ed,

In spite of -not much to be learned- , I do appreciate sharing.
May I conclude that many EMC/EMP tests have a happy end... and beer ?

Regards,

Ing. Gert Gremmen
Approvals manager
------------------------------------------------------------------------------------


+ ce marking of electrical/electronic equipment Independent Consultancy 
+ Services Compliance Testing and Design for CE marking
     according to EC-directives:
        - Electro Magnetic Compatibility 2004/108/EC
        - Electrical Safety 2006/95/EC
        - Medical Devices 93/42/EC
        - Radio & Telecommunication Terminal Equipment 99/5/EC
+ Improvement of Product Quality and Reliability testing Education

Web:    www.cetest.nl (English) 
Phone :  +31 10 415 24 26
-------------------------------------------------------------------
This e-mail and any attachments thereto may contain information that is 
confidential and/or protected by intellectual property rights and are intended 
for the sole use of the recipient(s) named above. 
Any use of the information contained herein (including, but not limited to, 
total or partial reproduction, communication or distribution in any form) by 
persons other than the designated
recipient(s) is prohibited. If you have received this e-mail in error, please 
notify the sender either by telephone or by e-mail and delete the material from 
any computer. 
Thank you for your co-operation.

From: Ed Price [mailto:edpr...@cox.net]
Sent: Wednesday 5 October 2016 13:34
To: EMC-PSTC@LISTSERV.IEEE.ORG
Subject: Re: [PSES] When is EMI testing performed?

Gert:

I really don’t have all that much experience with EMP testing; in the past 12 
years, I have put three systems through HIRF & EMP using the USN facilities at 
Patuxent River, MD.

• System 1 was an airborne instrumentation pod that had a secure data link back 
to ground assets. We were lucky that the entire airborne portion of the system 
was contained in a streamline pod, so except for the intentional signal ports 
and the aircraft power interface, the pod provided complete metallic SE. We 
concentrated on bandwidth limiting the ports, filtering and limiting the power 
interface, and on mechanical build of the pod skin. We passed without incident, 
so it could be argued that we also didn’t learn anything.
• System 2 was the ground segment of an unmanned airborne vehicle secure data 
link. This was essentially a pedestal mounted parabolic tracking antenna with 
some signal processing boxes. During RS103, we found unexpected failures, 
tracing them to a rotary slip-ring joint on the azimuth axis of the pedestal. 
The cause was found to be the improper specification of a commercial slip-ring 
joint instead of the military version (which was carefully shielded).  If this 
hadn’t been caught in RS103, I’m sure this would have failed EMP. When a 
proper, much more expensive (☺) joint was installed, RS103 was easily passed 
and so was EMP.  But again, no specific EMP test lessons either.
• System 3 was a secure data link that I won’t describe. Despite what we 
thought was careful design, this system had RE102 & RS103 issues. We had to use 
several different modular power supplies, change the layout of an RF deck, 
double-shield two cables and use about 20 EESeal connector filters on internal 
cables. Finally (after a lot of schedule slippage), it went through RE102 & 
RS103 just fine, but failed one of the HIRF tests. We didn’t have a clue, but 
in talking over the experience, someone said that lots of systems had been 
failing that one test recently. Hmmm, my suspicious nature came out. After 
talking in excruciating detail with the test lab personnel, we get them to run 
some tests with our system partially and then fully shut off, and miraculously, 
their lab monitor equipment reports another failure. The lab guys worked all 
night on the equipment test stand, their cabling and the shielded monitor hut, 
and with no further explanation, we passed the next day. !
 (And that was the very last environmental qualification test to be finished, 
so many unhappy people began breathing again.) Lesson learned was “oh thank 
goodness, it wasn’t my junk after all; beer for everyone.”

Ed Price
WB6WSN
Chula Vista, CA USA

-----Original Message-----
From: ce-test, qualified testing bv - Gert Gremmen [mailto:g.grem...@cetest.nl]
Sent: Tuesday, October 04, 2016 9:50 PM
To: Ed Price; EMC-PSTC@LISTSERV.IEEE.ORG
Subject: RE: [PSES] When is EMI testing performed?

Hi Ed,

Can you share with us some typical EMP caused defects, and their cause/fix  ? 
Most of us do not share your experience in this....

Regards,

Ing. Gert Gremmen
Approvals manager
------------------------------------------------------------------------------------


+ ce marking of electrical/electronic equipment Independent Consultancy 
+ Services Compliance Testing and Design for CE marking
     according to EC-directives:
        - Electro Magnetic Compatibility 2004/108/EC
        - Electrical Safety 2006/95/EC
        - Medical Devices 93/42/EC
        - Radio & Telecommunication Terminal Equipment 99/5/EC
+ Improvement of Product Quality and Reliability testing Education

Web:    www.cetest.nl (English)
Phone :  +31 10 415 24 26
-------------------------------------------------------------------
-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<emc-p...@ieee.org> All emc-pstc postings are archived and searchable on the 
web at: http://www.ieee-pses.org/emc-pstc.html
Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.
Website: http://www.ieee-pses.org/
Instructions: http://www.ieee-pses.org/list.html (including how to unsubscribe) 
List rules: http://www.ieee-pses.org/listrules.html
For help, send mail to the list administrators:
Scott Douglas <sdoug...@ieee.org>
Mike Cantwell <mcantw...@ieee.org>
For policy questions, send mail to:
Jim Bacher <j.bac...@ieee.org>
David Heald <dhe...@gmail.com> 

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<emc-p...@ieee.org>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website:  http://www.ieee-pses.org/
Instructions:  http://www.ieee-pses.org/list.html (including how to 
unsubscribe) List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <sdoug...@ieee.org>
Mike Cantwell <mcantw...@ieee.org>

For policy questions, send mail to:
Jim Bacher:  <j.bac...@ieee.org>
David Heald: <dhe...@gmail.com>

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<emc-p...@ieee.org>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website:  http://www.ieee-pses.org/
Instructions:  http://www.ieee-pses.org/list.html (including how to unsubscribe)
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <sdoug...@ieee.org>
Mike Cantwell <mcantw...@ieee.org>

For policy questions, send mail to:
Jim Bacher:  <j.bac...@ieee.org>
David Heald: <dhe...@gmail.com>

Reply via email to