In my opinion, all of this is rather simple.  Any LISN, ANSI or CISPR, references the noise to "ground".  Any conductor not being measured should be terminated in 50 ohms.  Whatever network used needs to make that so.  Take your pick.

On 4/5/2024 9:43 PM, T.Sato wrote:
On Fri, 5 Apr 2024 22:01:29 GMT,
   Brian Gregory <brian_greg...@netzero.net> wrote:

  Hello and Happy Friday, I've got a sales guy telling me our 120/240V EUT needs 
two pair of single-phase LISNs for our CE test bench.That's only slightly cheaper 
than a 3-phase unit at > 50A, but very bulky. Can someone remind me why I'd 
need 4, 50A single-phase LISNs for our unit?  I could see 3 (one for the neutral) 
but I'm not so savvy on EMC test equipment.
I think you can use either single 3-phase (usually 4 conductors + PE) LISN
or two single-phase (2 conductors + PE) LISNs whichever you like, although
I would prefer to use a single 3-phase LISN.

BTW, there maybe confusion with the term "single-phase LISNs" here.
Is it LISNs commonly used for single-phase AC supply?
Or is it LISNs for an single power supplying conductor?

Regards,
Tom

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
EMC-PSTC@LISTSERV.IEEE.ORG

All emc-pstc postings are archived and searchable on the web at:
https://www.mail-archive.com/emc-pstc@listserv.ieee.org/

Website:  https://ewh.ieee.org/soc/pses/
Instructions:  https://ewh.ieee.org/soc/pses/list.html (including how to 
unsubscribe)
List rules: https://ewh.ieee.org/soc/pses/listrules.html

For help, send mail to the list administrators:
Mike Sherman at: msherma...@comcast.net
Rick Linford at: linf...@ieee.org

For policy questions, send mail to:
Jim Bacher:  <j.bac...@ieee.org>
_________________________________________________
To unsubscribe from the EMC-PSTC list, click the following link: 
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
EMC-PSTC@LISTSERV.IEEE.ORG

All emc-pstc postings are archived and searchable on the web at:
https://www.mail-archive.com/emc-pstc@listserv.ieee.org/

Website:  https://ewh.ieee.org/soc/pses/
Instructions:  https://ewh.ieee.org/soc/pses/list.html (including how to 
unsubscribe)
List rules: https://ewh.ieee.org/soc/pses/listrules.html

For help, send mail to the list administrators:
Mike Sherman at: msherma...@comcast.net
Rick Linford at: linf...@ieee.org

For policy questions, send mail to:
Jim Bacher:  <j.bac...@ieee.org>
_________________________________________________
To unsubscribe from the EMC-PSTC list, click the following link: 
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1

Reply via email to