This email has two
attachments, giving the official meeting announcement and the meeting's draft
agenda in Word format.
Immediate below this message are plain-ascii versions of the two attachments, separated by asterisks.
The two sections of text after those, again separated by asterisks, are "copy and paste" versions of the same two attachments. These have special characters that could confuse some email-reading software.
I
would encourage those of you who feel strongly on this issue to attend the
meeting. -
Demetrios Matsakis P.S. Our listserv system has once again exhibited a mysterious flaw in which contributory emails are not received. The solution was to restart the server. If you have attempted to email anything to leapsecs in the last few weeks, please resend. If you continue to experience troubles, please contact me directly at [EMAIL PROTECTED].
****************************************************************************************************************************************** Press Release A Colloquium on the UTC Timescale will be held at Istituto Elettrotecnico Nazionale G. Ferraris (IEN) in Torino, Italy from 28-30 May 2003. The purpose of the colloquium is to discuss the future of the UTC timescale. As a result of issues raised by sector members of the ITU-R and a letter from the Director of the Bureau International des Poids et Mesures (BIPM) to the Secretary General of the ITU, a new question, ITU-R 236/7 (2000) "The Future of the UTC Timescale", was generated by ITU-R Study Group 7 (Science Services) Working Party 7A (Standard Frequency and Time Signal Services). The question considers the future definition and use of Coordinated Universal Time (UTC) in the ITU-R Recommendations. Any major change to the UTC timescale as defined in the current recommendations has a potentially significant impact on synchronization of communications networks and navigation systems and time distribution performance. Accordingly, Study Group 7 Working Party 7A has established a Special Rapporteur Group (SRG) to specifically address the future of the leap second and related issues. The SRG has held several coordination and technical exchange meetings to generate, analyze and discuss alternative approaches to reduce or eliminate the operational impact of the leap second. The work to date has produced a consensual opinion that the SRG wants to present and discuss with interested and representative parties. In support of that purpose the SRG has organized a concluding Colloquium for deliberating and drafting a recommendation to the ITU- R. Invited presentations will be made by distinguished representatives in the areas of International Timekeeping, Navigation, Earth Rotation, Telecommunications and Internet Timing. These areas could be impacted by changes in the UTC Time Scale. In addition, contributed presentations will be sought to insure that additional viewpoints would be expressed. Additional information can be obtained from Ron Beard, Chairperson of the SRG ([EMAIL PROTECTED]) and Bill Klepczynski, Secretary of the SRG ([EMAIL PROTECTED]). Press Release January 3, 2003 Press Release ******************************************************************************************************************************************* ITU-R Special Rapporteur Group (SRG) Colloquium on the UTC Time Scale Istituto Elettrotecnico Nazionale G Ferraris (IEN) Torino, Italy 28-30 May 2003 Introduction/Purpose As a result of issues raised by sector members and a letter from the Director of the Bureau International des Poids et Mesures (BIPM) to the Secretary General of the ITU, a new question, ITU-R 236/7 (2000) "The Future of the UTC Timescale", was generated by ITU-R Study Group 7 (Science Services) Working Party 7A (Standard Frequency and Time Signal Services). The question considers the future definition and use of Coordinated Universal Time (UTC) in the ITU-R Recommendations. Any major change to the UTC timescale as defined in the current recommendations has a potentially significant impact on network synchronization and time distribution performance. Accordingly, Study Group 7 Working Party 7A has established a Special Rapporteur Group (SRG) to specifically address the future of the leap second and related issues. The SRG has held several coordination and technical exchange meetings to generate, analyze and discuss alternative approaches to reduce or eliminate the operational impact of the leap second. The work to date has produced within the SRG a consensual opinion that the SRG wishes to present and discuss with representative parties of the scientific, standards and telecommunications agencies and groups. For that purpose the SRG is organizing a Colloquium for deliberating recommendations to the ITU-R. Invited presentations will be made by distinguished representatives in areas that could be impacted by changes in the UTC Time Scale. In addition, contributed presentations will be sought to insure that additional viewpoints would be expressed. Preliminary Agenda Day 1 - 28 MAY 03 Welcome by Prof. Bava, President of IEN 1. Introduction - Mr. R. Beard, NRL The charter, purpose and activities of the SRG to date and the detailed agenda and activities of this meeting 2. Astronomical Background - Bernard Guinot Astronomical history and rationale for the current UTC leap second scheme 3. ITU-R Background - Prof. S. Leschiutta, CCTF International Telecommunications Union, Radio Branch history/rationale for the current UTC leap second scheme 4. Considerations for International Timekeeping - Dr. T. Quinn, BIPM a) Scientific/International issues b) Operational impacts c) Financial aspects (cost of changes and other commercial impacts) Contributed papers 5. Navigation Issues (radio, satellite, GNSS, celestial) - TBD (GLONASS?) a) Technical issues b) Operational impacts c) Financial aspects (cost of changes and other commercial impacts) Contributed papers 6. Earth Rotation Issues - Dr. D. Gambis, IERS a) Technical Issues b) Operational impacts c) Financial aspects (cost of changes) Contributed papers 7. Telecommunications Issues - Ms. L. Orr, DISA a) Technical issues b) Operational impacts c) Financial aspects (costs and other commercial impacts or opportunities) Contributed Papers 8. Internet Timing Issues and Time Stamp Authority - Dr. J. Levine, NIST d) Technical issues e) Operational impacts f) Financial aspects (costs and other commercial impacts or opportunities) Contributed Papers 9. Presentation of SRG Opinions and Recommendation(s) - Mr. R. Beard Detailed presentation of SRG Opinions and Recommendation(s) 10. Roundtable discussion Discussion and Consideration of issues raised on proposed recommendations. 11. Summary of Colloquium Summarize issues and discussion on Recommendation(s) for Proceedings and Documentation for coordination with interested agencies and scientific bodies Adjourn the General Meeting
Day 3 - 15 NOV 02 SRG Executive Meeting (by invitation) Considerations on preparing Summary of Results of the Colloquium Finalization of Recommendation(s) to the ITU-R Adjournment DRAFT 3 January 2003 DRAFT ****************************************************************************************************************************************************************************************Press Release A Colloquium on the UTC Timescale will be held at
Istituto Elettrotecnico Nazionale G. Ferraris (IEN) in Torino, Italy from
28-30 May 2003. The
purpose of the colloquium is to discuss the future of the UTC
timescale. As a result of issues raised by sector members of the
ITU-R and a letter from the Director of the Bureau International des Poids et
Mesures (BIPM) to the Secretary General of the ITU, a new question, ITU-R 236/7
(2000) "The Future of the UTC Timescale", was generated by ITU-R Study Group 7
(Science Services) Working Party 7A (Standard Frequency and Time Signal
Services). The question considers
the future definition and use of Coordinated Universal Time (UTC) in the ITU-R
Recommendations. Any major change to the UTC timescale as defined
in the current recommendations has a potentially significant impact on
synchronization of communications networks and navigation systems and time
distribution performance.
Accordingly, Study Group 7 Working Party 7A has established a Special
Rapporteur Group (SRG) to specifically address the future of the leap second
and related issues. The SRG has held several coordination and technical
exchange meetings to generate, analyze and discuss alternative approaches to
reduce or eliminate the operational impact of the leap second. The work to date has produced a
consensual opinion that the SRG wants to present and discuss with interested and
representative parties. In support
of that purpose the SRG has organized a concluding Colloquium for deliberating
and drafting a recommendation to the ITU-R. Invited presentations will be made by distinguished
representatives in the areas of International Timekeeping, Navigation, Earth
Rotation, Telecommunications and Internet Timing. These areas could be impacted by changes
in the UTC Time Scale. In addition,
contributed presentations will be sought to insure that additional viewpoints
would be expressed. Additional information can be obtained from Ron Beard, Chairperson of the
SRG ([EMAIL PROTECTED]) and Bill Klepczynski, Secretary of the SRG
([EMAIL PROTECTED]).
ITU-R Special Rapporteur Group (SRG)
Colloquium on the UTC Time
Scale
Istituto Elettrotecnico Nazionale G Ferraris
(IEN)
Torino,
Italy
28-30 May 2003 Introduction/Purpose
As a result of issues raised by
sector members and a letter from the Director of the Bureau International des
Poids et Mesures (BIPM) to the Secretary General of the ITU, a new question,
ITU-R 236/7 (2000) "The Future of the UTC Timescale", was generated by ITU-R
Study Group 7 (Science Services) Working Party 7A (Standard Frequency and Time
Signal Services). The question
considers the future definition and use of Coordinated Universal Time (UTC) in
the ITU-R Recommendations. Any major change to the UTC
timescale as defined in the current recommendations has a potentially
significant impact on network synchronization and time distribution
performance. Accordingly, Study
Group 7 Working Party 7A has established a Special Rapporteur Group (SRG) to
specifically address the future of the leap second and related
issues. The SRG has held several
coordination and technical exchange meetings to generate, analyze and discuss
alternative approaches to reduce or eliminate the operational impact of the leap
second. The work to date has
produced within the SRG a consensual opinion that the SRG wishes to present and
discuss with representative parties
of the scientific, standards and telecommunications agencies and groups. For that purpose the SRG is organizing a
Colloquium for deliberating recommendations to the ITU-R. Invited presentations will be
made by distinguished representatives in areas that could be impacted by changes
in the UTC Time Scale. In addition,
contributed presentations will be sought to insure that additional viewpoints
would be expressed. Preliminary Agenda Day 1 - 28 MAY
03
Welcome by Prof. Bava,
President of IEN
1. Introduction - Mr. R. Beard,
NRL
The charter, purpose and
activities of the SRG to date and the detailed agenda and activities of this
meeting 2. Astronomical Background -
Bernard Guinot
Astronomical
history and rationale for the current UTC leap second scheme 3. ITU-R Background - Prof. S.
Leschiutta, CCTF
International
Telecommunications Union, Radio Branch history/rationale for the current UTC
leap second scheme 4. Considerations for
International Timekeeping - Dr. T. Quinn, BIPM
a)
Scientific/International issues b)
Operational impacts c)
Financial aspects (cost of changes and other commercial
impacts) Contributed papers
5. Navigation Issues (radio,
satellite, GNSS, celestial) - TBD (GLONASS?)
a)
Technical issues b)
Operational impacts c)
Financial aspects (cost of changes and other commercial
impacts) Contributed papers
6. Earth Rotation Issues - Dr.
D. Gambis, IERS
a)
Technical Issues b)
Operational impacts c)
Financial aspects (cost of changes) Contributed papers
7. Telecommunications Issues -
Ms. L. Orr, DISA
a)
Technical issues b)
Operational impacts c)
Financial aspects (costs and other commercial impacts or
opportunities) Contributed Papers
8. Internet Timing Issues and
Time Stamp Authority - Dr. J. Levine, NIST
d)
Technical issues e)
Operational impacts f)
Financial aspects (costs and other commercial impacts or
opportunities) Contributed Papers
9. Presentation of SRG Opinions
and Recommendation(s) - Mr. R. Beard
Detailed presentation of
SRG Opinions and Recommendation(s) 10. Roundtable
discussion
Discussion and
Consideration of issues raised on proposed recommendations. 11. Summary of
Colloquium
Summarize issues and
discussion on Recommendation(s) for Proceedings and Documentation for
coordination with interested agencies and scientific bodies Adjourn the General
Meeting
Day 3 - 15 NOV
02
SRG Executive Meeting (by
invitation)
Considerations on
preparing Summary of Results of the Colloquium Finalization of
Recommendation(s) to the ITU-R
Adjournment |
Press_Release_SRGmtg_Agenda_02.doc
Description: MS-Word document
Draft_SRGmtg_Agenda_030103.doc
Description: MS-Word document