1)  Scalability issues, specifically sending utilization data through the DB or 
via RPC call
2)  Follow ups on the scheduler BPs
3)  Opens?

PS: The list of scheduler BPs is:

1)   Extending data in host state
2)   Utilization based scheduling
3)   Whole host allocation capability
4)   Coexistence of different schedulers
5)   Rack aware scheduling
6)   List scheduler hints via API
7)   Host directory service
8)   The future of the scheduler
9)   Network bandwisth aware scheduling (and wider aspects)
10) ensembles/vclusters

--
Don Dugger
"Censeo Toto nos in Kansa esse decisse." - D. Gale
Ph: 303/443-3786


_______________________________________________
OpenStack-dev mailing list
OpenStack-dev@lists.openstack.org
http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-dev

Reply via email to