[ 
https://issues.apache.org/jira/browse/SLING-3651?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Stefan Egli reassigned SLING-3651:
----------------------------------

    Assignee: Stefan Egli

> Improve Conversion To Bundle and Content Projects
> -------------------------------------------------
>
>                 Key: SLING-3651
>                 URL: https://issues.apache.org/jira/browse/SLING-3651
>             Project: Sling
>          Issue Type: Bug
>          Components: IDE
>    Affects Versions: Sling Eclipse IDE 1.0.0
>            Reporter: Konrad Windszus
>            Assignee: Stefan Egli
>
> Currently the "Convert To Bundle Project" is always enabled and I can even 
> add the bundle facet to a maven project which is of packaging 
> "content-package"
> The "Convert To Content Project..." is only enabled under very specific 
> conditions. Currently those conditions are neither described in 
> https://cwiki.apache.org/confluence/display/SLING/Sling+IDE+tooling+User+Guide
>  nor is there some warning/trace messages available. 
> I would suggest the following:
> Always enable both conversion actions. Display a warning message with a very 
> descriptive warning in case the conversion cannot be performed.



--
This message was sent by Atlassian JIRA
(v6.2#6252)

Reply via email to