Re: [pfSense-discussion] Patch submittal deadline?

2007-04-22 Thread Kyle Mott
Do you care if the diff's/patches are from a February 1.0.1 snapshot, or 
would you prefer it from a 1.2-BETA snapshot?



-Kyle

Scott Ullrich wrote:

On 4/15/07, Kyle Mott [EMAIL PROTECTED] wrote:

Is there a deadline for submitting a patch to be included in the base
release? I'm still working on my EtherChannel port, but I've still got a
few things to work out. Will I still be able to get it in to the next
release (I assume 1.2), and/or 1.0.1 if I submit it soon (within the 
week)?


Unfortunately 1.2 is frozen now.   We can get it into 1.3 and the
snapshots after 1.2 is released.

Scott


Re: [pfSense-discussion] Patch submittal deadline?

2007-04-22 Thread Scott Ullrich

RELENG_1 and -HEAD would be fine.

We are past RELENG_1_2 deadline.

Scott


On 4/22/07, Kyle Mott [EMAIL PROTECTED] wrote:

Do you care if the diff's/patches are from a February 1.0.1 snapshot, or
would you prefer it from a 1.2-BETA snapshot?


-Kyle

Scott Ullrich wrote:
 On 4/15/07, Kyle Mott [EMAIL PROTECTED] wrote:
 Is there a deadline for submitting a patch to be included in the base
 release? I'm still working on my EtherChannel port, but I've still got a
 few things to work out. Will I still be able to get it in to the next
 release (I assume 1.2), and/or 1.0.1 if I submit it soon (within the
 week)?

 Unfortunately 1.2 is frozen now.   We can get it into 1.3 and the
 snapshots after 1.2 is released.

 Scott



Re: [pfSense-discussion] Patch submittal deadline?

2007-04-15 Thread Scott Ullrich

On 4/15/07, Kyle Mott [EMAIL PROTECTED] wrote:

Is there a deadline for submitting a patch to be included in the base
release? I'm still working on my EtherChannel port, but I've still got a
few things to work out. Will I still be able to get it in to the next
release (I assume 1.2), and/or 1.0.1 if I submit it soon (within the week)?


Unfortunately 1.2 is frozen now.   We can get it into 1.3 and the
snapshots after 1.2 is released.

Scott