P5/YT1AD would have the same structure of callsign as the current P5/4L
operator which works of verbal agreement. Hrane was talking about the
licensed call.

Just before left, Hrane gave me the callsign which is not P5/YT1AD.
However, the situation there may have changed.

Also, the fact that they worked short on 40 mtrs indicates that
they still did not have their beam set up (it is there since December).

The only thing that fits is timing. It is already March 6-th there.

Have no feedback for now, but will post as soon as I get something.



Nenad VE3EXY   ...
-------------------------------------------------------
Subscribe/unsubscribe, feedback, FAQ, problems, etc 
DX-NEWS  http://njdxa.org/dx-news
DX-CHAT: http://njdxa.org/dx-chat

To post a message, DX NEWS items only, [EMAIL PROTECTED]

Archives http://www.mail-archive.com/dx-news%40pro-usa.net/

Reply via email to