On Jul 18, 2023, at 8:50 PM, Ronald Cabaoig wrote:
Hi,
Does this mean that if I model a dispatchable component like -5MW <= P <= 5MW
with a corresponding cost, then the OPF decides whether the P takes on a
positive ("generator"
Hi,
Does this mean that if I model a dispatchable component like -5MW <= P <=
5MW with a corresponding cost, then the OPF decides whether the P takes on
a positive ("generator" mode, P is injected) or a negative ("load" mode, P
is drawn) value depending on the system scenario?
Cheers,
Ronald
这是来自QQ邮箱的假期自动回复邮件。
您好,我最近正在休假中,无法亲自回复您的邮件。我将在假期结束后,尽快给您回复。
Yes.
A generator is simply a complex power injection and its active and reactive
limits can be anything. Obviously, feasibility requires that PMIN <= PMAX and
QMIN <= QMAX. The only special case is that of a dispatchable load, defined as
a generator with PMAX=0 and PMIN < 0, in which case an