Gang,
I know the usual answer is it depends but which is the better build method?
Here are the considerations...
1. Time (I want to build as quick as possible)
2. Accuracy of the build. I can cut foam wings and I can
cut ribs by hand. I can also outsource these functions to have
the performed
Techniques: Foam Laminated vs Built up Pro's and Cons?
Gang,
I know the usual answer is it depends but which is the better build
method?
Here are the considerations...
1. Time (I want to build as quick as possible)
2. Accuracy of the build. I can cut foam wings and I can cut ribs
by hand. I
2 matches
Mail list logo