On Mon, 16 Feb 2009 19:50:07 +0100, Frederik Ramm frede...@remote.org
wrote:
For long waterways, it is absoutely usual to split them into a number of
ways of manageable size (think not only of the API limit but of someone
downloading an area touched by the river in JOSM!).
Optionally, use
Over on talk-us, we're discussing the appropriate way to import the National
Hydrography Database which contains most of the water features for the
United States. One of the issues we've uncovered is how to split long ways
and polygons to comply with the 2000-node limit. Have others discussed how
Hi,
Ian Dees wrote:
Over on talk-us, we're discussing the appropriate way to import the National
Hydrography Database which contains most of the water features for the
United States. One of the issues we've uncovered is how to split long ways
and polygons to comply with the 2000-node limit.
3 matches
Mail list logo