[Talk-GB] Maxspeed conundrum

2011-07-29 Thread Brian Prangle
The M1 between junctions 11 and 13 is a standard 70 mph NSL, but until spring 2013 it is a 50mph average speed camera regulated section during upgrade works. After Spring 2013 it will become maxspeed=signals. How to tag it? My preference would be for the 50mph average speed with a note that

Re: [Talk-GB] Maxspeed conundrum

2011-07-29 Thread Kev js1982
on the a46 dualling I have been putting the reduced limits in, but here the road is on a new alignment so its for the rest of the life of the road (until is becomes part of ncn route 48 anyway!) . Shame there's no way AFAIK of tagging fixme:2013-05-01=roadworks due to finish, resurvey

Re: [Talk-GB] Maxspeed conundrum

2011-07-29 Thread Peter Miller
I suggest that any 'temporary' speed limit change that will last more than 6 months could reasonably be tagged in maxspeed. Shorter periods should probably use a maxspeed:temporary or some other suitable overriding tag? Fyi, I have used 'proposed:maxspeed' to hold the intended new value where