Re: [Vo]:Crowdfunding and cold fusion

2012-09-20 Thread Te Chung
RE: [Vo]:Final response to Jojo Jaro2012/08/19 From Abd, Contrary to his [Jojo's] earlier statements, Jojo apparently does want to have the last word. So this is my last communication in response to him. I'm adding his email address to a deletion file. What took you so long?

Re: [Vo]:Topology is Key. Carbon Nanostructures are King

2012-08-21 Thread Te Chung
See: http://www.mail-archive.com/vortex-l@eskimo.com/msg65904.html Old. Works. Chung New. http://pesn.com/2012/08/18/9602162_My_Visit_to_Inteligentry/ Though I went in skeptical, having recently visited with some frustrated manufacturers, I came away impressed. Working on 100

Re: [Vo]:Theory Panel Dissensus

2012-08-17 Thread Te Chung
Meanwhile, Back in the Florida swamps LENR pioneer  http://www.google.com/url?q=http://www.i-b-r.org/NeutronSynthesis.pdfsa=Uei=nv4tUKGVHKSgywHMqYHQDwved=0CBkQFjACsig2=2jnJ7E68bs8RTEvQ80nLXAusg=AFQjCNHrasQAwAaBEkfYm1IQ61UuUIym_g  gets rich via NASDAQ

Re: [Vo]:Noble Gas Plasma Engine

2012-08-09 Thread Te Chung
Jo: 1.  Go  http://www.freepistonpower.com/fp3.aspx 2.  Replace cylinder + head with Rohner engine parts. 3.  Rohner Engineering make custom 100 kw model. 4.  $12,800,000.00 5.  Outsource work to CA engineering firm G. Cheap, Chung From: Jojo Jaro jth...@hotmail.com Subject: Re: [Vo]:Noble

Re: [Vo]:Back to Reality on Earth, my friends, please!

2012-08-05 Thread Te Chung
Yes. 4 plugs in row. Sequence. Into magnetic field from coil after. use one to inject RFG power. 3 spark. Pat now applied for. Chung --- On Sun, 8/5/12, integral.property.serv...@gmail.com integral.property.serv...@gmail.com wrote: From: integral.property.serv...@gmail.com

Re: [Vo]:Back to Reality on Earth, my friends, please!]

2012-08-05 Thread Te Chung
Aug 2012 02:57:15 -0700 Resent-From: vortex-l@eskimo.com Date: Sun, 5 Aug 2012 02:52:03 -0700 (PDT) From: Te Chung chung...@ymail.com Reply-To: vortex-l@eskimo.com To: vortex-l

Re: [Vo]:Brillouin Energy making waves

2012-03-30 Thread Te Chung
Gluck, IF this system is able to remove the three usual weaknesses of the majority of the pre-Rossi LENR systems i.e. low intensity, bad reproducibility and short duration. Peter Systems ok. Weakness only by operator. Easy. 10 Plate Heat Exchanger SS304 Copper Brazed 7.5 x 2.9 from