For reference, the mpi timings can be approximately represented as
Total Time ~ Const1/Cores *((Jobs per Bus)**0.6) + Const2
with Const1 ~ 1900, how much of the CPU time gets parallelized
Const2 a non-parallelizable overhead of about 60
The dual quad-core has two memory buses.
On Wed, Apr 23,
No, these are not necessarily vectors in an orthogonal system. We adapt
the coordinates to the specific case, eg. in hex lattices, hexagonal
coordinates (with 120 angle) are used.
This is determined by the ORTHO variable in latgen.
??? schrieb:
Dear Wien2k user,
I have a very step-in
/20080424/ff8a061d/attachment.html
3 matches
Mail list logo