On Wed, 2010-01-27 at 22:49 -0700, Alex Rousskov wrote:
> c) Co-Advisor currently only tests MUST-level requirements. Old Robert's > checklist contained some SHOULD-level requirements as well. I see that > Sheet1 on the spreadsheet has SHOULDs. Are we kind of ignoring them (and > Sheet1) for now, until all MUSTs on Sheet2 are satisfied? > > d) I do not know who created the spreadsheet. Whoever it was, thank you! > Is there a script that takes Co-Advisor results and produces a > spreadsheet column for cut-and-pasting? It looks nice. It might be based on the xls spreadsheet I made, but I don't know ;) I would not worry about SHOULD's until the MUSTs are done (but if a SHOULD is in reach while doing a MUST, doing it would be good). -Rob
signature.asc
Description: This is a digitally signed message part
