In a message dated 8/2/2002, Paul Didcott writes:

> All local parties now in agreement to implement the TBR21 & TBR38 (including 
> previously opposed Telco), with a few minor amendments. 


Hi Paul:

Thanks for the heads up.  Do you know if one of the "minor amendments" you 
refer to above is the deletion of the 60 mA current limiter requirement in 
the TBR 21 DC V-I characteristic?  It would be a shame if this was left in, 
since the South African network has never needed it in the past.


Joe Randolph
Telecom Design Consultant
Randolph Telecom, Inc.
781-721-2848
http://www.randolph-telecom.com

Reply via email to