"Rossi explained that the equipment that we saw today at a cost of about € 2000 per KW, KW a product from a power plant costs 10 times as much oil, the cost of a kW produced by a nuclear power station, considered the problem of waste, is not even calculable!"
But, but, BLP claims $25 per kW. Let the new energy wars begin! T