"Rossi explained that the equipment that we saw today at a cost of
about € 2000 per KW, KW a product from a power plant costs 10 times as
much oil, the cost of a kW produced by a nuclear power station,
considered the problem of waste, is not even calculable!"

But, but, BLP claims $25 per kW.  Let the new energy wars begin!

T

Reply via email to