>From Rossi: "Also our Customer has chosen other suppliers for the first generation of the domestic E-Cats and of the 1 MW plants. "
It is possible that a simple PLC/PAC could have been chosen. I don't think stabilization would be that big a challenge. All Rossi needed was some feedback. T