Hi Yong-Geun,

As per my understanding after quick review, following are some editorial and 
further explanation of some details you mentioned in the draft:

1.  3.2. first para: better further define IPSS or completely exclude it.
2.  3.3. third para: "Portable Parts (PP) attached" - instead of - "PP 
attached".
3.  4. Design Space. first and second para: incorrect reference of "RFC 6558" - 
instead of - "RFC 6568"
4.  5.1. first para: suitably rephrasing "However, the person data" to let 
suppose "However, the personal data, which pose serious issues if mishandled 
while transferred in wireless domain, can be securely transferred by NFC 
technology".
5.  5.3. Reliability & QoS: "Latency of SENSOR READINGS" should be low for".
6.  5.4. first para: "communications" - instead of - "communicatios".
7.  5.5. first para: "Therefore, the use case of LTE MTC could be used in 
LPWAN" - instead of - "Therefore, the use....".
8.  5.5. example: if you are referring to connectivity between end device and 
LPWAN gateway, how about using the term "fronthaul" instead of "backhaul"?
9.  5.5. example: "star of star topology" - instead of - "star of stat 
topology".
10. 5.5. example: Maximum data rate is mentioned for LoRa; keeping the 
consideration of bandwidth aggregation recently proposed in 
"draft-qin-lpwan-dau-00" would be better.

Afterward, we can keep rephrasing the sentence that requires some modifications.

Hope you find the suggestions, useful.

Thanks.
Rashid Sangi,
Huawei, Beijing, China.


From: 6lo [mailto:[email protected]] On Behalf Of Samita Chakrabarti
Sent: 2016年5月14日 8:41
To: [email protected]
Subject: Re: [6lo] Call for 6lo Deployment Scenario Document phone meeting



PS: Please update the Doodle poll for your preference on attendance. [ for next 
week]

http://doodle.com/poll/y9akcyphnrtvwusa





Please reply only to ‘[email protected]’.  [ Else the mail administrator complains 
about too many recipients]



Thanks,

-Samita

From: Samita Chakrabarti
Sent: Friday, May 13, 2016 5:28 PM
To: Yong-Geun Hong ([email protected]<mailto:[email protected]>); 
[email protected]<mailto:[email protected]>; Thomas Watteyne 
([email protected]<mailto:[email protected]>); 
[email protected]<mailto:[email protected]>; Carsten Bormann 
([email protected]<mailto:[email protected]>); Mohit Sethi M; 
[email protected]<mailto:[email protected]>; 'Das, 
Subir'; '[email protected]'; '[email protected]'; Alexander Pelov 
([email protected]<mailto:[email protected]>); Gabriel Montenegro 
([email protected]<mailto:[email protected]>)
Cc: [email protected]<mailto:[email protected]>
Subject: Call for 6lo Deployment Scenario Document phone meeting

Hello All:

At Buenos Aires, we had a very productive discussion on updating 
https://datatracker.ietf.org/doc/draft-hong-6lo-use-cases/
In order to use it more for guidance to other IETF WGs and external SDO as to 
how 6lo WG technologies might be useful to yet another L2 networks that are 
serving constrained devices.
The document already discusses different parameters for different technologies  
and typical deployment.

The goal is to improve the document  and present it as an 6lo Applicability 
document for others to know how to use this technology.

Yong-Geun is heading this effort and  he might need some extra hands to help 
him out.

I plan to arrange a phone meeting next week (Wed/Thurs) @7am PDT to discuss:


・         Outline proposal of the updated document

・         Nail down the usecase scenarios



Thanks,

-Samita





PS: Please update the Doodle poll for your preference on attendance.

http://doodle.com/poll/y9akcyphnrtvwusa



_______________________________________________
6lo mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/6lo

Reply via email to