I have a database that I've just converted from Active4D v3.x. and
4D 6.8 to Active4D v4 rc6 and 4D 2004.4.
Everything works AOK except for the following line of code:
vTotalStaffRequired:=$SumRequired-aSplitTotals{6}
vTotalStaffRequired is typed in the database as a longint and is
initialised in the A4D script via a call to a 4D Method.
$SumRequired is also typed as a longint and is assigned within the
A4D Script
aSplitTotals{6} is a Longint array and is assigned in the script
by a 4D Method call
This is related to a similar problem your reported a while ago.
Please report this in the issue tracker.
Regards,
Aparajita
www.aparajitaworld.com
"If you dare to fail, you are bound to succeed."
- Sri Chinmoy | www.srichinmoylibrary.com
_______________________________________________
Active4D-dev mailing list
[email protected]
http://mailman.aparajitaworld.com/mailman/listinfo/active4d-dev
Archives: http://mailman.aparajitaworld.com/archive/active4d-dev/