Thanks it is done.

Regards, Michael.

On 17 Feb 2006, at 01:07, Aparajita Fishman wrote:

I have a database that I've just converted from Active4D v3.x. and 4D 6.8 to Active4D v4 rc6 and 4D 2004.4.

Everything works AOK except for the following line of code:

vTotalStaffRequired:=$SumRequired-aSplitTotals{6}

vTotalStaffRequired is typed in the database as a longint and is initialised in the A4D script via a call to a 4D Method.

$SumRequired is also typed as a longint and is assigned within the A4D Script

aSplitTotals{6} is a Longint array and is assigned in the script by a 4D Method call

This is related to a similar problem your reported a while ago. Please report this in the issue tracker.

Regards,

   Aparajita
   www.aparajitaworld.com

   "If you dare to fail, you are bound to succeed."
   - Sri Chinmoy   |   www.srichinmoylibrary.com


_______________________________________________
Active4D-dev mailing list
[email protected]
http://mailman.aparajitaworld.com/mailman/listinfo/active4d-dev
Archives: http://mailman.aparajitaworld.com/archive/active4d-dev/

_______________________________________________
Active4D-dev mailing list
[email protected]
http://mailman.aparajitaworld.com/mailman/listinfo/active4d-dev
Archives: http://mailman.aparajitaworld.com/archive/active4d-dev/

Reply via email to