Timoty,
time specified in schedule, which is one second after midnight already was
(I mean today 12/15). Next one second after midnight will be on 16th.
Right?

Regards

Ing. Jozef Zatko
Login a.s.
Dlha 2, Stupava
tel.: (421) (2) 60252618



Timothy Hughes <[EMAIL PROTECTED]>
Sent by: "ADSM: Dist Stor Manager" <[EMAIL PROTECTED]>
12/14/2004 05:48 PM

Please respond to
"ADSM: Dist Stor Manager" <[EMAIL PROTECTED]>


To
[EMAIL PROTECTED]
cc

Subject
Scheduler problem






Hello,


I checked the DSMcad  and it shows the next scheduled operation is for
12/16/04 it should say 12/15/04.

I killed the DSMCAD and restarted it, But it shows the next backup
schedule 12/16/04. These backups runs everynight. I need to get
this backup ready for 12/15/04.

Anyone every have this problem with the schedule showing
the wrong date? This is happening on the two Backup sessions that
I cancelled this morning.

AIX client 5.1.5
TSM 5.2.3.5

Thanks for any help!


$ tail dsmwebcl.log
Executing scheduled command now.
12/14/04   11:26:34 (dsmcad) Next operation scheduled:
12/14/04   11:26:34 (dsmcad)
------------------------------------------------------------
12/14/04   11:26:34 (dsmcad) Schedule Name:         MIDNIGHT
12/14/04   11:26:34 (dsmcad) Action:                Incremental
12/14/04   11:26:34 (dsmcad) Objects:
12/14/04   11:26:34 (dsmcad) Options:
12/14/04   11:26:34 (dsmcad) Server Window Start:   00:00:01 on 12/16/04

12/14/04   11:26:34 (dsmcad)
------------------------------------------------------------
12/14/04   11:26:34 (dsmcad) Waiting to be contacted by the server.
ForwardSourceID:NT000549D6

Reply via email to