I would be worried about water filling up the pipes and busting the bottom legs.
Is the allowance for drainage?

On 04/16/2015 01:23 PM, Jaime Solorza wrote:

Two bases done. 6 mast supports done. Weather might slow us down. Oh well

Jaime Solorza


Reply via email to