So the base sticks down below the concrete at the bottom and sits in the
gravel so it can drain out?

On Thursday, April 16, 2015, Jaime Solorza <[email protected]>
wrote:

> Plenty of gravel at base of pit. 4000 psi concrete mix for this area.
> Lots of caliche in area.   Rebar cage.  Not touching tower ...Dottie taped
> tower bottom section in concrete. ..did I miss anything?
>
> Jaime Solorza
> On Apr 16, 2015 2:17 PM, "Bill Prince" <[email protected]
> <javascript:_e(%7B%7D,'cvml','[email protected]');>> wrote:
>
>>  Probably works just fine as long as the bottom drain is set up properly.
>> However, you're kinda screwed if something damages that base section.
>>
>> bp
>> <part15sbs{at}gmail{dot}com>
>>
>>
>> On 4/16/2015 12:12 PM, Chuck McCown wrote:
>>
>>  That’s what it looks like to me too.
>>
>>  *From:* Bill Prince
>> <javascript:_e(%7B%7D,'cvml','[email protected]');>
>> *Sent:* Thursday, April 16, 2015 1:11 PM
>> *To:* [email protected] <javascript:_e(%7B%7D,'cvml','[email protected]');>
>> *Subject:* Re: [AFMUG] SCADA tower
>>
>>  That looks like a regular 10' section with the bottom half in the
>> concrete (JMO)...
>>
>> bp
>> <part15sbs{at}gmail{dot}com>
>>
>>
>> On 4/16/2015 11:43 AM, Chuck McCown wrote:
>>
>>  Is that an official base section or just a regular section?
>>
>>  *From:* Jaime Solorza
>> <javascript:_e(%7B%7D,'cvml','[email protected]');>
>> *Sent:* Thursday, April 16, 2015 12:23 PM
>> *To:* Animal Farm <javascript:_e(%7B%7D,'cvml','[email protected]');>
>> *Subject:* [AFMUG] SCADA tower
>>
>>
>> Two bases done.   6 mast supports done.    Weather might slow us down.
>> Oh well
>>
>> Jaime Solorza
>>
>>
>>
>>