What model are you using?
On 4/6/2016 9:49 AM, Josh Reynolds wrote:
Vermeer
We have 3-4 out a day depending on the schedule. (Still putting in
backbone)
On Apr 6, 2016 8:37 AM, "Adam Moffett" <[email protected]
<mailto:[email protected]>> wrote:
I was eyeballing a Ditch Witch 410sx because it seems to be an
all-in-one kind of deal where you can use one machine for
horizontal drilling, trenching, and plowing.
The instructions for horizontal drilling talk about digging a
launch pit at least 20' long. My concern there was that when
we're drilling under a road, we'd be digging this launch pit way
outside the ROW. I'd worry about a landowner stopping a project
because they don't want us to mess up their grass (we have people
like that around here).
Is there a different machine I should be looking at for going
under roads and driveways?