That's good advice, thanks.

I see what you're saying about laying out the whole run at the first obstruction and what a pain that would be.

I pictured plowing in an HDPE conduit with a pull tape in it rather than plowing cable directly into the ground. So I'd be pulling the entire run off a reel trailer either way. At the moment this project exists mostly in my imagination so if plowing in conduit is a dumb idea, this would be a perfect time to tell me. :)



The discussion about whether you should drill or plow a certain stretch is subjective. Remember that every time you plow and need to go under an obstacle you have to figure 8 the whole cable run, or cut and have a splice point there. That can be a lot of labor if you're trying to keep a long run intact. Personally, when we are running in a rural area, if we have driveways every 200-400ft we drill that area. If we can go 800ft or more without obstructions then we plow that.

Chris