I considered those but they're not gigabit, correct?

Thanks,
`S

---
Sent mobile, typed by thumbs.

On Apr 28, 2016, at 09:39, Josh Baird 
<joshba...@gmail.com<mailto:joshba...@gmail.com>> wrote:

Oh, yeah, that was you!  That makes sense.  We are looking at using SyncBox 
12's at the top just for timing FSK (and 450 too I guess).  This allows us to 
run 48V up the tower which we use to power WS-12-250-DC's.  The FSK/450 gets 
timing port sync from the SyncBox and 24V power from the WS-12-250-DC.  No need 
for separate SyncInjectors or DC-DC converters in this scenario.  Just an idea.

On Thu, Apr 28, 2016 at 11:25 AM, Scott Vander Dussen 
<sc...@velociter.net<mailto:sc...@velociter.net>> wrote:
I'm the guy who just smoked a ring of FSK APs by running 48v to them! :)  I 
wanted to use 48v for the reasons you just stated but because much of the 
Cambium equipment is only 24v this meant having a DC DC converter in the 
enclosure which is another point of failure, expensive, and impractical to step 
down large wattages.  I understand the same point of failure is in the WS but 
it's integrated and hidden so I pretend it's not there. :)

With the 12awg SOOW we use even on a 600' run there is less than 3% voltage 
drop. The WS can take as little as 9VDC. The rectifier can easily be tuned up 
to 27v to offset any drop. Also we gut the AC DC supplies in the 1016 Mikrotik 
and run it direct DC since it takes 24vdc.  Everything is fully DC, finally!

I'll reply with ICT price when I'm back in the office.

Thanks,
'S

Sent mobile!

On Apr 28, 2016, at 09:15, Josh Baird 
<joshba...@gmail.com<mailto:joshba...@gmail.com>> wrote:

Interesting that you are using 24V and not 48V especially since you are running 
DC up the tower where voltage drop may be a concern.  I realize the 
WS-12-250-DC's will automatically up-convert to whatever, but they are more 
efficient if you feed them a higher voltage (~48V).  If you already have 4 
batteries at the base, what is keeping you from using a 48VDC rectifier?

Would you mind sharing the approximate cost of that ICT?  Off-list is fine if 
you would like.

Thanks,

Josh

On Thu, Apr 28, 2016 at 12:01 PM, Scott Vander Dussen 
<sc...@velociter.net<mailto:sc...@velociter.net>> wrote:
Thanks!  The base of the tower is quite simple:

Kendall Howard 12U 19" Wall Mount Rack http://goo.gl/pbpnbk
ICT1200-24SBC 24v rectifier (also a 600W version available) http://goo.gl/GkOBBW
12v 45ah TR45-12 Tempest AGM Batteries (4x in parallel and series to make 24v) 
http://goo.gl/rCXciW
3U 19" Inch Rack Mount Shelf For Pro Audio and Computer Networking 
http://goo.gl/SJQ6DP
MikroTik CCR1016-12S-1S+ http://goo.gl/h5N4RQ
6 Port Rack Mount Fiber Enclosure Pre-Loaded with SC SM Connectors 
http://goo.gl/8x5fcg

The 4x batteries fit on the 3U tray and take up just under 4U of total height.  
There is enough room in the 12U rack for up to 2 of these 4U battery trays.  
The MikroTik is all SFP ports because we run fiber to everything, with the 
exception of one copper eth cable to the rectifier for battery management and 
monitoring.

Incidentally the Mimosa B11 backhauls will accept the BiDi SFP transceivers 
linked on the SMM Details.PDF parts list, provided they are HP compatibility.  
So we use the switch to power the B11s and then it’s fiber goes directly into 
the fiber patch panel (fiber run in liquidtight from enclosure).  The CCR1016 
then has all the backhauls directly connected via fiber, and the APs are 
grouped 8 APs per switch (per fiber) so for every 8 APs there’s a full gig to 
the router.  (You could have 12 APs per switch if you added 6 SyncInjectors 
total).  The enclosures are standardized so we are building to have hot spares 
on standby ready to go in the event of a catastrophic failure.

I was asked offline about what DC/fiber we’re using:
1000’ 12/4 SOOW SO 600V Power Cord http://goo.gl/mKVXG1
Armored outdoor OS2 singlemode 9/125 6-strand fiber, Male SC UPC Simplex to 
Male SC UPC Simplex, http://www.best-tronics.com/fiber.htm

`S


From: Af [mailto:af-boun...@afmug.com<mailto:af-boun...@afmug.com>] On Behalf 
Of Josh Baird
Sent: Thursday, April 28, 2016 04:32
To: af@afmug.com<mailto:af@afmug.com>
Subject: Re: [AFMUG] CMM for 2016 What's in the box?

This looks nice.  Good job.  What all do you have at the bottom?

On Wed, Apr 27, 2016 at 8:54 PM, Scott Vander Dussen 
<sc...@velociter.net<mailto:sc...@velociter.net>> wrote:
I built a CMM for 2016!

Highlights:

*         Gigabit everything

*         BiDi fiber support for 6 devices

*         Sync/Power up to 24 devices

*         Power 24v and 48v devices

*         Temperature monitoring

*         Fan ventilation controlled by rain/condensation sensor

*         Fan seizure notification

*         LED light strip controlled by door

*         Door alarm trigger

*         Hoist pull loop

*         20" x 18" x 10"

*         36lbs

*         Price circa $2100

Photo here: https://dl.dropboxusercontent.com/u/6582330/WebJunk/SMM.jpg
Parts list here: 
https://dl.dropboxusercontent.com/u/6582330/WebJunk/SMM%20Details.pdf

Any suggestions to make this more awesome?

[http://www.flutecrate.com/uploads/1/0/2/0/10200817/5243300_orig.jpg]