Ha....Yes. I am aware of that.... Wondering what they come up with tomorrow
On Mar 29, 2017 3:18 PM, "Mark Radabaugh" <[email protected]> wrote: > That’s not a proper operational control panel until you take all those > pretty wire way covers and throw them in the bottom of the box. > > I would seriously suggest getting a small enclosure to terminate the fiber > cable into and then using a patch cable between the switch and the fiber > patch. The first guy yanking wires in that panel is going to bust that > fiber up. > > Mark > > On Mar 29, 2017, at 5:11 PM, Jaime Solorza <[email protected]> > wrote: > > So we got hired to install two Moxa switches and Prosoft Ethernet to DF1 > with power supplies to link an ABB Symphony system to a Siemans PLC > system. An electrical​ contractor ran conduit (about 800 ft) , fiber and > termination. We tested the fiber and made sure we could ping Prosoft from > Siemans side. All good. The fiber guys are bring something to protect > these connections. Not sure how it will work...The Moxas are installed > where they told us to put them...We brought enclosures but they wanted > everything in their cabinets. Let's see what happens tomorrow when all > these engineers from ABB, Siemans and Prosoft are in same place.... > <KIMG6327.JPG> > > >