Ha....Yes.  I am aware of that.... Wondering what they come up with tomorrow

On Mar 29, 2017 3:18 PM, "Mark Radabaugh" <[email protected]> wrote:

> That’s not a proper operational control panel until you take all those
> pretty wire way covers and throw them in the bottom of the box.
>
> I would seriously suggest getting a small enclosure to terminate the fiber
> cable into and then using a patch cable between the switch and the fiber
> patch.   The first guy yanking wires in that panel is going to bust that
> fiber up.
>
> Mark
>
> On Mar 29, 2017, at 5:11 PM, Jaime Solorza <[email protected]>
> wrote:
>
> So we got hired to install two Moxa switches and Prosoft Ethernet to DF1
> with power supplies to link an ABB Symphony system to a Siemans PLC
> system.  An electrical​ contractor ran conduit (about 800 ft) , fiber and
> termination.   We tested the fiber and made sure we could ping Prosoft from
> Siemans side.  All good.   The fiber guys are bring something to protect
> these connections.   Not sure how it will work...The Moxas are installed
> where they told us to put them...We brought enclosures but they wanted
> everything in their cabinets.   Let's see what happens tomorrow when all
> these engineers from ABB, Siemans and Prosoft are in same place....
> <KIMG6327.JPG>
>
>
>