Yes From: Af [mailto:[email protected]] On Behalf Of Josh Baird Sent: Thursday, May 25, 2017 3:57 PM To: [email protected] Subject: Re: [AFMUG] Hybrid Control tower top
And you are using a SyncBox connected to the timing port of the 320 for sync? On Thu, May 25, 2017 at 2:18 PM, Paul McCall <[email protected]<mailto:[email protected]>> wrote: Very creatively. We took apart a Motorola POE (old style) and rewired it +,- +,- .. We power off ports 1,2,3 or 4, and data in a different port. Uses 2 ports instead of 1 but does the job From: Af [mailto:[email protected]<mailto:[email protected]>] On Behalf Of Eric Rogers Sent: Thursday, May 25, 2017 11:40 AM To: [email protected]<mailto:[email protected]> Subject: Re: [AFMUG] Hybrid Control tower top How are you powering a 320 on the S16? Eric Rogers [PDSConnect_logo-Connecting You to the World - Signature Logo] www.pdsconnect.me<http://www.pdsconnect.me> (317) 831-3000 x200<tel:(317)%20831-3000> From: Af [mailto:[email protected]] On Behalf Of Paul McCall Sent: May 25, 2017 11:24 AM To: [email protected]<mailto:[email protected]> Subject: Re: [AFMUG] Hybrid Control tower top We are using S16s which work well. Not using them with Medusa stuff though. Using 450s, ePMP, Canopy, 320s, UBNT, Mikrotik etc successfully From: Af [mailto:[email protected]] On Behalf Of Dave Sent: Thursday, May 25, 2017 9:43 AM To: Animal Farm <[email protected]<mailto:[email protected]>> Subject: [AFMUG] Hybrid Control tower top I am looking or want to know what everyone else is doing for a tower type controller similar to CMM4 with a planet switch? I am sure that I may have missed the thread on this but wanted to see what everyone was doing for this. The Cmm4 with planet switch and a good sfp fiber module has been bullet proof for us on a few sites and I have a few more new ones that may require this and I want to move more to gige solution that will support Medusa,pmp450i systems. These boxes are usually mounted below the first set of sectors around 300' or so. I am looking a putting one together using some of forests' products just for simplicity of Din Rail snap in tech. I can get a nice ip66 enclosure like the cmm4 to mount everything in but before I dive into this I want to see what you guys are doing. If Cambium is listening I hope they are taking notes : ) If they are.. What I would like is Din Rail modules in the tower top box because the poor tower climber doesnt handle small parts very well in high winds. Thanks Dave -- [cid:[email protected]]
