Our Cat5 is all tower top. Fiber to the EP-S16 then short runs to the APs 
(always less than 15 feet).  Since the APs are grounded to a bus bar (currently 
attached to the tower – not isolated).  We ground the shield and drain wire at 
the AP end

From: Af [mailto:[email protected]] On Behalf Of Josh Luthman
Sent: Monday, July 24, 2017 2:53 PM
To: [email protected]
Subject: Re: [AFMUG] Tower Grounding - carrier 1 pictures

Are you stripping the cat5 jacket and grounding the shielding like them?


Josh Luthman
Office: 937-552-2340
Direct: 937-552-2343
1100 Wayne St
Suite 1337
Troy, OH 45373

On Mon, Jul 24, 2017 at 2:30 PM, Paul McCall 
<[email protected]<mailto:[email protected]>> wrote:
Note that this first carrier is directly tied at the bottom of the tower (and 
isolated from the tower at the top)



Paul McCall, President
PDMNet, Inc. / Florida Broadband, Inc.
658 Old Dixie Highway
Vero Beach, FL 32962
772-564-6800<tel:(772)%20564-6800>
[email protected]<mailto:[email protected]>
www.pdmnet.com<http://www.pdmnet.com>
www.floridabroadband.com<http://www.floridabroadband.com>



Reply via email to